Su-57
Multirole combat fighter with additional deliveries reported in September 2026.
Equipment dossier →UAC delivered a batch of Su-57 aircraft in a new technical configurationPublished 24 Sept 2026Russia's public portfolio spans combat aircraft, armour, air defence and nuclear submarines. Service and delivery records below use official government and manufacturer announcements; combat-effectiveness claims and current fleet availability are not inferred.
Default model rank #2 in the 50-country sampleGFP 2026 published estimates; inventory and personnel definitions vary. Budget is a source estimate, not audited expenditure. View figures and source review date.
Representative platforms documented in public sources. Service status records the source announcement; it does not establish fleet size or current readiness.
Multirole combat fighter with additional deliveries reported in September 2026.
Equipment dossier →UAC delivered a batch of Su-57 aircraft in a new technical configurationPublished 24 Sept 2026Multirole combat fighter accepted and delivered to the Russian Air Force.
UAC Delivered a Batch of the Su-35S to the FieldPublished 27 Aug 2026Main battle tank with continuing manufacturer-reported Army deliveries.
UVZ delivered T-90M and T-72B3M tanks to the troops for Tankman's DayPublished 12 Sept 2026Modernized main battle tank supplied to Russian land forces.
UVZ delivered T-90M and T-72B3M tanks to the troops for Tankman's DayPublished 12 Sept 2026Short-range air-defence systems with publicly reported delivery and duty status.
Rostec delivered a batch of Pantsir systems to the troopsPublished 19 Aug 2026Strategic ballistic-missile submarine class; Sevmash reported delivery of Knyaz Pozharsky in 2025.
New Year greeting from the Director General of SevmashPublished 31 Dec 2025The operational Su-57 continues to receive upgraded aircraft while further propulsion and configuration development proceeds. Rostec reports flight testing of the next-stage engine and new-configuration deliveries in 2026.
Latest dated record: 24 Sept 2026
In June 2026 UAC's head described Checkmate as being at prototype-construction stage. Deliveries depend on customer requirements and agreements; the statement does not confirm a first flight or production order.
Latest dated record: 3 Jun 2026
Manufacturer disclosures describe continued Borei-A construction and the delivery of Knyaz Pozharsky to the Navy during 2025. Follow-on boat acceptance dates are not inferred from that delivery.
Latest dated record: 31 Dec 2025
Sevmash confirms an ongoing Yasen-M construction programme and reports that Perm was moved out of the construction hall during 2025. Launching or moving out of the hall is not final naval acceptance.
Latest dated record: 31 Dec 2025
Land formations, armour, artillery and supporting capabilities.
Combat and support aviation, aerospace defence and associated modernization programmes.
Surface and submarine forces including sea-based strategic-deterrent platforms.
Strategic-missile forces and domestic manufacturers sustain deterrence and equipment renewal; no inventory totals are estimated.
Public 2025 defence planning prioritizes strategic deterrence, modernization, air defence, communications, electronic warfare and unmanned systems. This records stated priorities without adopting official battlefield-success claims.
SIPRI estimates approximately 4,400 warheads in the military stockpile, January 2026; retired warheads are excluded. Source